Literature Review Of Monobore Completion Techniques Economics Essay

A huge bulk of operators are looking frontward at monobore completion techniques as possible solutions to economic and operational challenges. This technique can heighten the completion procedure and the benefits of this construct act uponing different stages of the well engineering that can ensue in to a broad scope of operational advantages. However, this doctrine requires using purpose built equipments in order to avail its advantages. The oil and gas industry is paying attending at operational efficiency and cost film editing methods and therefore, the professionals of this industry are in hunt of the techniques that have the potency to better in these countries.

Monobore completion techniques tend to supply a great degree of flexibleness for care operations that the operators are doting to accomplish. As per its design, the tube does non look to enforce any limitation over any equipment that has been used in the line drive. This technique reduces service costs since particular tools are discarded for such Wellss. But these operational nest eggs are normally non recognized until really tardily in the development of the well since the cost nest eggs via monobore construct are really much anticipated and non instant which makes it difficult to cipher the precise sum of extra disbursal for the completion procedure that is critical for doing determinations sing the elaborateness of the down hole constituents. The restriction of monobore engineering is that the conventional seal dullards introduce may act upon the possible public presentation of other down hole services which include those demanded by production logging. The conventional design constructs can non be used to plan the standard for monobore completions. For case, due to the decreased diametral clearance, monobore completions will non follow with the typical designs of sub surface flow control devices. Furthermore, traditional lock spindle systems depend on intervention prosecuting packing so that the stoppers and the choking coils can be sealed.

This research paper tends to compare monobore boring engineering with its conventional opposite number on the footing of the instance surveies of some specific oil Fieldss. Besides, it will discourse the monobore engineering in item by stipulating its costs and benefits. Furthermore, the paper describes the different constituents of monobore boring and besides, surveies different proficient facets of monobore engineering.

Table OF CONTENTS

1. Introduction… … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … ..Error: Reference beginning non found

3.1 Disposal Monobore Completions 9

3.2 Cement thru Completion System 9

3.3 Monobore Injection wells 9

Figure 1 demoing the typical completion used and estimated for each of the completion types. 10

3.4 Performance of Monobore Systems 11

The conventional completion is proven but accordingly most expensive than its other opposite numbers due to the inclusion of zonary isolation, cased good bore, safety valve and conventional gas lift side pocket spindles. The monobore completion shown in the figure above is the disposable well completion that includes safety valve, tubing and cemented in topographic point. It is most cost effectual completion due to its simpleness. However, it does non offer droping the well and the production addition for the well. Furthermore, it does non allow the remedial work to put in any rig so that the life of a well can be increased since the packed is non included in this design. 11

Figure 2 demoing the design procedure with the extended fluid dynamic simulations to exemplify the fluid features through the completion procedure. 11

It was indispensable to place the countries where the residuary cement was left behind after the cement was pumped out. SPM was found to be the most critical country which might do it difficult to replace the gas lift valve or the dummy valve. The countries highlighted in the figure 2 are those where the design sweetenings were assured to do turbulency and allow these critical constituents clean on their ain? Safety valves use the same design constructs to curtail the aggregation of sand in them and this illustrated the necessity of turbulent flow across the SPM organic structure. 12

Introduction

Monobore completion techniques are deriving more attending in the modern-day universe of good boring. ‘Monobore ‘ refers to the completion that employs changeless size of the completion twine ID through out the well. The benefits of such completions are classified in to two basic classs: good production and remedial operations due to which monobore completions are given penchant over conventional completions. However, it has certain restrictions excessively. Monobore Wellss are fundamentally pursued due to cut down boring cost and figure of specialised equipments as these straight influence the cost of completion. A batch of the Wellss would hold been impractical if they have to be completed through the traditional technique. However, such impracticable Wellss would go better marginally, or profitable or even extremely profitable in some instances if they employed a system in which both the rig clip and the equipment list, such as baggers, skiding arms, etc. , could be reduced while pull offing to safely finish the well. The earliest methods included cementing the completion in the wellbore. Later methods include presenting the cement procedure so that the equipments increasing the well ‘s life and determining its safe operation could be included.

This paper discusses several methods sing monobore good design that saves important clip through cut downing the full cost of completion. A important figure of surveies have been late executed in order to set up a system that is more sustainable to finish these Wellss and increase their productiveness that makes them even more attractive to the operators. Detailed processs will be discusses with the aid of the illustrations that explains the assorted strengths and restrictions of each completion method in a well completion procedure. Each method will be supported through instance surveies.

1.1 AIM

The survey is aimed towards look intoing and measuring the appraisal methods of current and future techniques of monobore Wellss.

1.2 Aims

In order to achieve the above mentioned purpose, the following aims should be achieved in this survey.

Describe and explicate the monobore Wellss along with their costs and benefits in comparing to the conventional boring techniques.

Study the construct of monobore Wellss and the different methods of monobore completions.

Conduct feasibleness of a well to cover by comparing the conventional and mono-bore boring with each other.

Grok the hereafter development of mono-bore Wellss, and urge research and development work that may do the current applications to spread out.

Literature Review

Contemporary well could be categorized as short life or harvest Wellss out of which some are economically impracticable since they employ high terminal completion rigs and methods. This quandary could be resolved through monobore Wellss. A well is classified as a monobore completion if it has individual production tubing size right a manner from wage zone through out the surface of completion. Despite the fact that there monobore completions have some restrictions but they besides have assorted benefits such as decreased boring cost and lesser assortment of rigs, which includes baggers, skiding arms, etc. , involved in the boring procedure in comparing to its other opposite numbers. A batch of Wellss that were impracticable through the conventional completion governments have found to be safely and expeditiously completed with monobore completion system. That is why this completion technique has acquired the attending of many operators and research workers and therefore, it is extensively applied to horizontal Wellss today.

Cementing the completion in the wellbore is regarded as one of the most crude methods used. Then this method was enhanced by presenting the procedure with the aid of equipments in order to do the well last long along with operational safety. A batch of researches and surveies have been carried out so that a more dependable and improved system of completion could be developed for finishing these Wellss with increased end product. Reservoir and wellbore fluid mechanicss simulations have been studied for a long clip. Research workers are now concentrating on the interaction between the fluid flows of reservoir and wellbore since the horizontal Wellss are extensively applied. The benefits of using monobore completions are now easy acquired since the industry is inclined towards high rate gas completions. These benefit of monobore completions are categorized as: well production benefits and remedial operations benefits.

Well Production Benefits:

Increased tubing size in monobore completions that besides increases the deliverability of a well.

Lesser figure of wellbores is done to expeditiously run out the reservoir.

This can cut down the figure of needed platforms, particularly in instance of the seaward undertakings.

Decrease in the operational and care cost due to the lessening in the figure of good dullards.

Increased lastingness and dependability since the monobore completions are simpler in comparing to their traditional opposite numbers.

Further, the gas turbulency countries are reduced due to the riddance of internal limitations.

Remedial Operations Benefits:

Remedial operations benefits are really known towards the terminal of the field ‘s life.

The riddance of internal limitations besides makes it simple to run services and for intercession equipments.

Furthermore in monobore completions, the line drive top can be wholly accessed which enables easier mechanical isolation or squeezing.

The necessity of conveying compaction on line can be delayed due to the increased tube size as it reduces the frictional force per unit area bead whilst production.

Field development clip is besides reduced through running 95/8 in. monobore. This reduced clip enables the operators to bring forth first gas earlier or get down the undertaking every bit tardily as the clip being saved. Therefore, the net present value of a big undertaking is dramatically affected. Normally, this addition in value is higher than the cost of increasing the tube size.

Monobore completions can present higher end product than the expected production.

Monobore Systems

The Oil and Gas industry has the premier concern to finish the well in the most efficient and cost effectual mode. A batch of researches, as mentioned earlier in this paper, have been conducted over the periods of clip to do the procedure of good completion as safest and productive as possible. Like any other engineering, well completions besides have several advantages and disadvantages which vary with the different techniques used for good completions. Out of these assorted good completion techniques, monobore completions have found to offer better benefits as compared to their conventional opposite numbers. The basic definition and assorted benefits of the monobore completion systems have been discussed in the old subdivision. So, this chapter will concentrate on the assorted methods of monobore completions since the application of the right method will be most good for the well completion. The monobore completion system works as a individual trip mechanism that enables the operator to run out out the cement by being offline, so that the platform can use the equipments at its different locations. Different methods of monobore completions along with their costs and benefits are described further.

3.1 Disposal Monobore Completions

This method is based on unfastened or cased holes and is besides named as upper hole completion. Since tube is the lone conduit to the surface hence successful cementing is really indispensable in this method. Most of the times really limited figure of rigs which include baggers, gas lift spindles, skiding arms and surface controlled sub-surface safety valves, are required by these completion methods. The premier aim of this method is to minimise the cost of the completion. Such Wellss are perforated across the wage zones that is why zonary issue is one of their jobs.

3.2 Cement thru Completion System

This is a existent monobore system that operates after the cement is drained out. It employs force per unit area rhythms for the assorted rigs to run. The method is aimed towards happening out the impact of the residuary cement on the well bore unity. Such systems increase the possible to eliminate extra trips that minimizes the associated safety issues. This method besides reduces rig clip extensively. Short life Wellss utilizing this method significantly salvage cost and besides better safety and productiveness. Furthermore, this method minimizes the fishing operations that add up to be and clip. Staged cementing technique can be used in an application in which unfastened hole cementing method could non perchance be employed.

3.3 Monobore Injection Wellss

This method reduces rig clip of H2O injection good completion. Subsidence formation is the basic job in this method that normally amendss the casing disenabling the well. The method maintains cannular unity and reduces the rig clip about by 4 yearss with decreased figure of rigs used due to its ability to cement through the tube.

Figure 1 demoing the typical completion used and estimated for each of the completion types.

Beginning: Ingvardsen, Don et al 2009.

3.4 Performance of Monobore Systems

The conventional completion is proven but accordingly most expensive than its other opposite numbers due to the inclusion of zonary isolation, cased good bore, safety valve and conventional gas lift side pocket spindles. The monobore completion shown in the figure above is the disposable well completion that includes safety valve, tubing and cemented in topographic point. It is most cost effectual completion due to its simpleness. However, it does non offer droping the well and the production addition for the well. Furthermore, it does non allow the remedial work to put in any rig so that the life of a well can be increased since the packed is non included in this design.

Figure 2 demoing the design procedure with the extended fluid dynamic simulations to exemplify the fluid features through the completion procedure.

Beginning: Ingvardsen, et al 2009.

It was indispensable to place the countries where the residuary cement was left behind after the cement was pumped out. SPM was found to be the most critical country which might do it difficult to replace the gas lift valve or the dummy valve. The countries highlighted in the figure 2 are those where the design sweetenings were assured to do turbulency and allow these critical constituents clean on their ain? Safety valves use the same design constructs to curtail the aggregation of sand in them and this illustrated the necessity of turbulent flow across the SPM organic structure.

Figure 3 demoing the comparing between the completion clip of the antecedently known disposable completion system and the latest cement thru completion system.

Beginning: Ingvardsen, et al 2009.

Feasibility Study on a well to cover with the differences between conventional and mono-bore boring

This paper will further sum up the development of a monobore well system stressing over the choice standards for the stuffs, field tests and other system development phases. This subdivision of the study will peculiarly turn to the different operational and deployment methods and phases for the development of the well system along with the history proving plan that includes field tests.

4.1 Description of the System

The system under consideration here characterizes a phase attack for the monobore well development plan. This system deploys an expandible line drive through the casing subdivision of intermediate length. The line drive is expanded below this intermediate length casing subdivision along with keeping the same ID as that of the intermediate twine. A deferral profile stationed at the so terminal of the intermediated twine is used to link the system with the intermediate shell twine. The method of top down enlargement is employed to exchange the shell to and from its ‘run in ‘ and ‘post enlargement ‘ provinces after being deployed to depth.

4.2 System Deployment Method

The first phase of the system is concerned with put to deathing a particular deferral shoe at the terminal of the intermediate shell threading alternatively of the standard shell cement shoe. The protective ID of this deferral shoe inhibits cement from making the shoe ID and is bored easy by the standard spots. The expandible line drive is deployed such that the conventional shell holding the caution stuff and connexions are able to spread out along with keeping the force per unit area unity. Rubber coated pipe subdivisions supplying the annulate waterproofing potency, are located at the coveted points in casing twine. These no-good constituents stretch out as the pipe expands against the unfastened hole wellbore. Future systems will utilize the cement as the ring sealing medium.

4.3 System Expansion Method

The line drive expands from top to down after the line has been arranged down hole with the aid of the hydraulic mechanical system. The same tool is used in this enlargement system as the 1 that was to take the line drive to the deepness. A taper shaped round cone is used to spread out the pipe. This cone moves through the line drive to increase the tally in size of the line drive to its station enlargement size. The mechanism of hydraulic Piston and ground tackle combination is used for bring forthing the energy required to travel the cone through the pipe. This system starts runing when the force per unit area applied to the wellbore drill pipe is converted in to mechanical additive force with the aid of the down hole Piston that is connected with the enlargement cone. A hydraulic ground tackle experiences the force generated by the Piston which means that the Piston at the same time activates the force per unit area. The ground tackle protects the upper part of the Piston through to the environing shell and hence, applies the reaction force that inhibits the drill pipe from traveling upward with in the hole since the Piston strokes the cone down the wellbore which makes pipe spread out along its shot length.

The figure 4 provided below illustrates a good onshore Egypt in which “ shales packed off around the drill threading before the 12 A?-in. open-hole subdivision could be completed. The well had been planned to 4,600 m and needed to hold a 9 5/8-in. casing below 2,950 m to accomplish geographic expedition aims. The 9 5/8-in. shell stopped at 2,859 m. The monobore expandible line drive was brought in. The first effort failed, but the 2nd effort was successful. The 8 A?-in. open-hole subdivision was drilled out of the expanded line drive to 3,890 m ” ( Drilling Contractor Magazine, 2010 ) .

Figure 4: A good onshore Egypt saved due to the Deployment of Monobore Expandable Liner Extension.

Beginning: Drilling Contractor Magazine, 2010.

The application is the promotion of the current and validated technique of the Hydraulically Expandable Tubular System that can be used in other expandible merchandises every bit good. The application considered some elements of Finite Element Analysis ( FEA ) patterning back uping the system design. The enlargement method is executed such that:

the line drive is hung

fixed in topographic point by utilizing the cement

hanger is sealed

coveted mechanical belongingss of the system are achieved

This paper illustrates the feasibleness survey for a hydraulic expandible line drive hanger. Surveies have been conducted with the purpose of happening the possibility of using the Hydraulically Expandable Tubular Technology ( HETS ) in order to develop the slim good liner hanger system that minimizes the down-hole equipments along with supplying a life of good, burden bearing, metal to metal and force per unit area tight connectivity. Harmonizing to its nature, such a design will see much smaller clearances between the current shell and the line drive in contradiction to the conventional hangers.

This attack provides legion possible advantages such as:

Its futuristic design is congruous with the slim good doctrine.

Reliable deployment since the remotion of baggers and elastomers simplifies the conventional line drive hanger.

Better operating dependability due to the simpler metal to metal design seal.

The critical intermediate casing twine eventuality is attained in the well building procedure due to the slender design of the system.

Improved good plan envelope such as under the sea applications.

4.4 Developed Expansion System-Validation of expandible monobore line drive extension

Concept: A instance survey

Initially the intent of an expandible monobore line drive extension was to let the operator to delve deeper geographic expeditions and production Wellss bearing the larger holes at the reservoir. With the eventuality program the end is so set to let the operator to insulate zones possessing reactive shales, formations of low break gradient or other boring restrictions with out cut downing the shell and size of the hole in the reservoir. The feasibleness of the expandible monobore line drive extension construct was validated through the creative activity of a one-trip-top-down enlargement system that optimizes the shell constellation along with cut downing the cost but with out cut downing the size of the drilled hole.

The figure 5 given below shows the Kristin and Kvitebjorn Fieldss that are the HPHT gas and condensate Fieldss at the Norse sector of the North Sea. Kristin is situated in the southwesterly portion Halten Bank whereas the Kvitebjorn is located in E of Gullfaks. Kritin has the force per unit areas at 1300 pounds per square inch and temperatures at 340oF. The expandible system formed depends on these values. Furthermore, Kvitebjorn needed some elastomers as the stuff to defy chemicals. Both Kristin and Kvitebjorn are depletion thrust but later their boring and completion activities expected to take topographic point in a moderate to high depletion reservoir.

Figure 5: Kristin and Kvitebjorn Fieldss

Beginning: ( Boring Contractor, 2006 )

-Objective of the Undertaking

These Fieldss may confront the challenge of boring new Wellss when depletion has taken topographic point significantly. The break gradient reduces along with the consuming zones. Differentially stuck pipe and fluid losingss can ensue in these Fieldss due to the inordinate force per unit area difference between the hydrostatic force per unit area of the fluid and the pore force per unit area. Even the force per unit area maintained Fieldss may confront depleted stray packages ensuing in boring jobs. Therefore, these Fieldss require the undermentioned four aims to accomplish.

safety

force per unit area and good control of open-holes

cut down non-productive clip to back up well-bore

economic sciences that require 7 inch production line drive for the reservoir

The resulting challenges due to ( a ) hole stableness care and ( B ) potency reservoir harm control in the development of the Fieldss under consideration require to reject the determined boring eventualities for bettering economic sciences of the Fieldss.

The traditional eventuality method would necessitate running 7 inch line drive along with 41/2 inch completion for work outing the boring jobs. However, for sufficient production during depletion, the 41/2 inch completion would look to be a important restriction in malice of accepted in some Fieldss.

-Pre-planning

Different solutions were considered for rating for accomplishing the undertaking objectives. Well and casing design proposed 7 inch production line drive to be fixed at 13944 ft perpendicular deepness in entire. The history of both the Fieldss signifies that this deepness could be achieved through making the predicted alteration of possible force per unit area of about 870-1450 pounds per square inchs due to depletions. The scope of the existent alteration of force per unit area would non be determined prior to boring the shale subdivisions below the estimated 95/8 inch intermediate shoe deepness at 12992 ft entire perpendicular deepness. To keep such values of force per unit areas, wellbore stableness and reservoir deepness for the 7 inch production line drive, the contrivers measured that a less than 435 psi alteration of force per unit area would carry through the standard design and aims. On the other manus, a alteration of force per unit area greater than 435 pounds per square inchs would oblige the execution of a eventuality boring plan. However, these steps met all but one undertaking aim of economic ends since the production line drive would be decreased to 4.5 inch. Planners introduced and examined the eventuality monobore systems for both the Fieldss on the footing of their influence on all the four undertaking aims.

-Development

A paradigm test executed on the proposed expandible line drive system. At first the ultra-sonic ( UT ) review was performed over the 75/8 inch line drive and so it was executed in the well in which free-end expanded to 22 % . Surface interrupting breaks were observed as the pipe retrieves after enlargement. After this test, the size of the tubulars changed from 75/8 inch to 8 inches in outer diameter which farther, reduces the enlargement per centum to 18 % from 22 % and besides lowers the important emphasiss in the pipes.

Another test was executed on the system in some clip after the first test. Again all the articulations were UT inspected before the test. This review of the 36 articulations of the shell inferred that force per unit area trial was applied on the twine and besides, the full length magnetic atom inside ( FLMPI ) review was performed on it. It was found that the two articulations have surface indicants as can be seen in figures 6 and 7 given below.

Figure 6 ( left ) and figure 7 ( right ) demoing that the 2 articulations of casing carry surface indicants as identified in the 2nd test. This mandates the demand for an enhanced pipe review.

Beginning: ( Boring Contractor, 2006 )

These consequences identified the demand for an enhanced pipe review. An improved UT review was formulated by utilizing 18 shear transducers. These extremely sensitive compaction transducers measure even low degree defects merely below the outer diameter surface.

Subsequently another test was executed holding 27 articulations through the new review method in order to choose the pipe that was considered non suited. The expanded line drive was inspected and retrieved through the wall. It was found that the twine carry no defects with near-surface inclusions.

-Monobore Liner Extension Selection

Several monobore systems were examined transporting out extended paradigm testing and system makings to fulfill the operator. The selected eventuality system further summarized a staged attack to monobore good plan.

The bing system in these Fieldss deployed expandible line drive with the aid of the current intermediate shell subdivision and run to depth. This new line drive is farther, expanded below the intermediate subdivision while keeping the same interior diameter as that of the intermediate subdivision. A deep-set profile in the eventuality shoe connected the monobore system with the intermediate shell twine.

Figure 8 demoing the eventuality deferral shoe for non-cementable expandible line drive. The Fieldss used the eventuality deferral shoe which did non let for cementation of the expanded line drive.

Beginning: ( Boring Contractor, 2006 )

The eventuality shoe run accompanied by the intermediate line drive works as the normal shell shoe, nevertheless, it besides provides a recess country and location profile for the line drive, if required. The one trip monobore expandible line drive is used and deployed with the aid of the top down techniques for enlargement when it is concluded that boring plan eventualities must be employed to accomplish the well aims. When the hydraulic ranges near to the shoe of the expandible line drive so it is removed on the same trip through retrieval tool latches upon a retrievable usher shoe. The Kristin employed the eventuality deferral shoe on the intermediate line drive for non cementing the expanded line drive as shown in figure 8 above where as the eventuality deferral shoe for the Kvitebjorn field employed skiding arms and ports, as shown in figure 9 given below, to let for cementation and flow country of the line drive.

Figure 9 screening eventuality deferral shoe for the cementable expanded line drive

Beginning: ( Boring Contractor, 2006 )

Present and Future Drilling

The developments in oil and gas boring is non merely limited to making the hole through the latest engineering and techniques, they are instead concerned with safety, hazard direction, scheme, eco-protection, experience, dependability and economic sciences, in peculiar and at big. The cardinal benefits that the operators expect to accomplish from boring activities and system are stated below:

Reduce non-productive clip

Reduce productiveness clip by doing the productiveness procedure fast.

Increase overall productiveness of the well.

It has been found that operators like to go on with the bing engineerings until the new engineerings are proven to supply better consequences for cost and hazard attached with their deployment.

5.1 Future Development-Hole Expansion

Hole expansion is extremely of import towards the success of the operating expandible tubular and screens. The completion of the occupation is finely based on the quality of the planned borehole enlargement required.

Since the old 8 old ages, there have been important attempts applied in the development of hole expansion tools in order to heighten its productiveness and cut down its cost/expenses. This lifting usage of expandible tubulars and mono-diameter engineering, in peculiar has introduced new challenges that current tools are incompatible and therefore, recommended the demand for new Hole Enlargement ( HE ) engineering and merchandises.

5.2 Future Challenges

Presently, expandible tubulars are supplying the footing for the farther development of the hereafter engineering so that the staying barriers to developments in deepwater and ultra-deep H2O can be broken. The new engineering is based upon monobore good. Some experts propose that a good comprising of a individual shell diameter from the top tree to the underside would extensively salvage steel due to fewer film editings. The hereafter engineering would likely unite the expandible cannular engineering with the managed force per unit area boring integrated with shell and line drive boring. The two most of import boring challenges to come seem to be:

accessing resource, and

handiness of proficient expertness

This is chiefly because of that the oil and gas industry is exchanging from perpendicular to deviated- horizontal boring engineerings at a much faster gait. Boring systems are dependent on drivers for their executing. The of import drivers include safety, hazard, concern scheme, environment protection, and above all oil field economic sciences and operator necessities.